Again the meeting held at Jalan Duta court today resulted in loses on our part as we have to incur all cost to do trial for about 5 month again where for the first 2 months being the training period for our typist and the remaining 3 months will be the trial period of our Briefcase in 3 court in KL.
As for me, the result from this meeting has put me into a situation where I have to, again, crammed my head to start to finish added features (after observation during a week trial period) of Briefcase in a short period of time.
There are two things need to be done. One is fairly easy but the other requires changes on most part of the system in client application, editor and server. The changes might have to be checked and tested throughly again and again as these changes are quite dependent with the other modules in each applications and thus, if there are lost dependencies or references of any of the object, it will result in system crash. These things have been foreseen earlier with designing modular system but yet there are parts here and there where things get too complicated and sometimes things need to be completed immediately but with me being the only programmer (not much trouble) with other things to be considered (this seem to contribute more on the causes. Mostly because I’m still student), the design is left aside and proceed with what come into my mind. Yet, till now, I’m quite satisfied with my work though I realized that if I am to have enough time (full time programmer and not being a student), I would have done better. Everything is there (in my head) but the execution cannot be done properly.
Apart from that, the system run O.K till now but it just how the code was arranged is not as what I prefer and learned. At the end, I hope the system will be beneficial and used by the government.



